In Progress
CtrlS DC-02, Hyderabad
Engaged with Jakson on the 150 MW CtrlS DC-02 hyperscale facility (four data halls of 10 to 20.4 MW IT load on dual-path 22 kV). Coordinated LOD 350 shop drawings, spool sheets, BOQ extraction and LOD 450 as-built models in federated Revit.
